References - order by products

USA, Houston, TX, St. Luke´s Episcopal Hospital




Object
St. Luke´s Episcopal Hospital 
Fields of application
Moisture Mitigation System
Description
Moisture Mitigation System (Flooring)- The St. Luke´s Episcopal Hospital in Houston, Texas had sheet vinyl flooring that failed due to a high moisture and alkalinity condition. Calcium chloride tests per ASTM F-1869 showed 6-17 lbs. and the pH was as high as 14. Because this was in a hospital, they needed a quick, yet dependable solution for their concrete problems. They started the job on a Friday by installing protection on the walls and equipment, removing the failed flooring, and shot blasting the failed adhesive off of the floor. They then installed KOSTER VAP I 2000 FS, primed it with KOSTER VAP I 06 Primer, skim coated the floor with a cementitous patch and new sheet vinyl flooring was then installed. The rooms were cleaned and operational by Sunday morning.  
Product applied
KÖSTER VAP I 06
KÖSTER VAP I 2000 FS
Contractor
Specified by Eric Serna with Milestone Project Management Installation Contractor: Jonathon Guel with Architectural Floors 
Select product:

 

 

Back

Top
Albania Austria Bosnia and Herzegovina Brasil Bulgaria China Croatia Czech Republic Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Kuwait Latvia Lebanon Macedonia Mexico Netherlands New Zealand Norway Panama Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia South Africa Spain Thailand Turkey Ukraine United Kingdom United States of America